Affordable regional homes,
ready to partner.
Scroll to walk through the model — from site to solar to the partner brief.
The work begins before the build.
- [x]Land secured for first dwelling
- [x]Structural engineering signed off
- [x]Architectural designs signed off
- [x]CDC ready to proceed
50% glass. Flat roof.
One repeatable home.
Floor-to-ceiling glass across the front and half the side — light-first regional housing, engineered to build the same way, every time.
A rooftop array sized to bill-crush.
Twenty-panel array on a flat roof — designed to materially reduce tenant power bills, targeting near-zero where technically achievable.
The bottleneck is land,
not imagination.
If you have a site, a housing mandate, or a veteran housing pathway, Trevor Estates wants the conversation.
Indicative three-bedroom build cost excluding land and broader civil/site costs. To be verified through quotes and detailed application evidence.
A staged model built to help fix Australia's housing crisis.
Land, planning pathway and local demand — starting with a ready-to-build first dwelling in the Riverina, scaling across Australia.
We work with private developers, councils, CHPs, employers and government pathways — whichever fits the site and the tenants.
Staged rollout toward 1,000 homes. Evidence, review, then repeat at scale.
Who Trevor Estates is built to work with.
Pathways for veteran-focused cohorts, subject to partner model.
CHPs seeking a ready-to-build, evidence-backed pipeline.
Regional councils with land, demand or planning pathway.
Suitable regional sites we can help move to buildable.